Company News Contact information
 

References

November 29, 2007

“Electroobogrevstroy” LLC has designed and built the transportable electric installation on the basis of the SST equipment (FSU heating cable). The above listed works have been duly executed within the terms, that has prevented emergency situation. There have been no stoppages or failures of the LLC SST’s equipment during the exploitation term.”

Download PDF (116 Kb) “PERMNEFTEGAZPERERABOTKA” LLC

October 30, 2004

“All the listed works have been executed within the shortest terms and with good quality. The supplied equipment meets all the requirements of the technical assignment”

Download PDF (395 Kb) OJSC “Volgogradskaya Firma “Neftezavodmontazh”

October 17, 2004

“One of the main advantages of “Special Systems and Technologies” LLC is the complex approach to the problem solving and executing of full-cycle works, including design, construction, installation and start-up”.

Download PDF (330 Kb) OJSC “GAZPROM”
CJSC “GAZPROMSTROYINGENEERING”

August 2, 2004

“OJSC “NK-Rosneft»-Arkhangelsknefteproduct” reports that in 2003 “Special Systems and Technologies” LLC has executed works on the electric heating of the pipelines of the Oil terminal in Arkhangelsk. Within the framework of the project “Special Systems and Technologies” LLC has provided the full complex of services – design, supply, designer supervision of the system installation and start-up … The introduction of the modern systems of electric heating has allowed receiving considerable energy savings”

Download PDF (91,9 Kb) OJSC “NK-Rosneft»-Arkhangelsknefteproduct”

April 21, 2004

“OJSC “Khabarovskiy neftepererabativayuschiy zavod” has been cooperating with “Special Systems and Technologies” company for four years. During that time SST LLC has designed many projects of electrical heating of the pipelines, apparatus and equipment and controlling equipment for the plant… The projects of equipment heating have been timely executed with good quality”

Download PDF (177 Kb) OJSC “Khabarovskiy NPZ”

February 06, 2003

“All the services on construction and supply have been executed within the shortest terms. The supplied equipment meets all the necessary requirements”

Download PDF (354 Kb) “Severniye MN” LLC

November 13, 2002

“Considering the existing cooperation experience SST LLC always provides high quality of works within the shortest terms”

Download PDF (426 Kb) CJST “GazInStroy (GIS)”

July 31, 2002

“All the works concerning the construction and supply has been executed in the shortest terms. The supplied equipment had met all the requirements”

Download PDF(329 Kb) CJSC “KOMINEFTENERGOMONTAZAVTOMATIKA”

July 25, 2002

“For two and a half years OJSC “RITEK” has been cooperating with SST LLC in the part of using the systems “Teplomag” and other products of oil pipelines, water lines, reservoirs, containers and stop valves heating at the objects of construction in the regions of Western Siberia and Far North in YNAR and HMAO of Tyumen region. Within this period SST LLC has laid about 5000m of heating cable, mounted hundreds of heating and heat suppler distribution control cabinets at the technological pipelines, reservoirs, containers and other equipment…. One of the main advantages of SST LLC is their complex approach to the tasks, i.e. the design, installation, start-up and maintenance works are fulfilled within the guarantee period under the obligations taken. As a result – the quality of works and the responsibility to the Client increase”

Download PDF (579 Kb) OJSC “RITEK”

July 24, 2002

“The production works and supply have been executed within the agreed terms”

Download PDF (367 Kb) CJSC “Trade House “Familnyi”

July 26, 2001

“…“Special Systems and Technologies” LLC has executed works on construction and supply of the pipeline and reservoirs’ heating system “Teplomag” with the usage of self adjusting heating cables… All the works on construction and supply have been executed within the shortest terms. The delivered equipment meets all the necessary requirements”

Download PDF (439 Kb) “TEPLOTEKHNIKS” LLC

January 10, 2001

“All… the works have been executed in compliance with the requirements of Gosgortekhnadzor, regulations of electrical equipment installation, safety rules and with high quality”

Download PDF (393 Kb) OJSC “Chernomortransneft”

The preheated vessels on Harampurskoe field

The SST company has completed the heating cable delivery for vessels

The pipeline system Eastern Siberia-Pacific Ocean is being expanded

Some more stations of the ES-PO project received the SST products

International exhibition” Oil and gas of Turkmenistan” Ashgabad.

"Special systems and technologies", LLC together with the Turkmen colleagues took part in the exhibition.
  Question-answer SST web-sites